Loading...
en

quangongzi's blog

Multilayer the stand or fall that real wood floor installs is affected directly multilayer the use effect of real wood floor and life, here, network of Chinese wood floor is small make up you to introduce 3 kinds common and those who use is multilayer real wood floor installs a method, what consumer can choose to suit his according to his actual condition is multilayer real wood floor installs a method. 

One, stick type continuously multilayer real wood floor installs a law (apply to type of the heat of the earth's interior and) of type of blame terrestrial heat: Moistureproof cloth + floor

1, suitable scope: Apply to on any account to differ the ground that losing 2 ㎜. 

2, install measure: 

(On the 1) , ground that has rebuildinging, spread fortify wet cloth to cover whole area first, produce the result in order to achieve moistureproof sound insulation evenly. The data filling up a layer that is used at the heat of the earth's interior is unfavorable heavy panel, conduct with benefit quantity of heat. 

(2) is spread on moistureproof cloth multilayer real wood floor. 

2, straight shop type is multilayer real wood floor installs a law (apply to) of type of blame terrestrial heat: Splint + moistureproof cloth + multilayer real wood floor

1, suitable scope: Apply to ground flatness not to exceed 5MM and the ground of 2 building above. 

2, install measure: 

(1) clears the ground, splint should curium cut do not be more than 600×600 ㎜ norms, between splint and plywood the aperture of obligate 5~10 ㎜. 

(2) spreads fortify tide or anti-flammability bubble cotton on splint, wet cloth of wall frontier defence should over ground 8-10MM, between splint and moistureproof cloth need not stickup. 

(3) again will multilayer shop of real wood floor is on moistureproof cloth, multilayer between real wood floor and moistureproof cloth need not stickup, nail 45 degrees of horn in order to do not have a head to be nailed on fair tenon fixed and multilayer real wood floor. 

3, frame expensive type is multilayer real wood floor installs a law (apply to) of type of blame terrestrial heat: Special wood keel + thick plywood + moistureproof cloth + floor

1, suitable scope: Apply to ground flatness not to exceed 5MM and the ground of 2 building above. 

2, install measure: 

(1) equipment is very special wooden keel, span is less than between wooden keel be equal to 350 ㎜, wear a face must level off. 

(2) is able to bear or endure on the besmear on wooden keel water adhesive, the splint store that controls ply for 12 ㎜ is on framework, splint should curium cut do not be more than 600×600 ㎜ norms, between splint and plywood span 5~10 ㎜, reoccupy air gun infiltrates the hammer that do not have a head be secured on splint and framework. 

(3) is moistureproof on splint upper berth cloth, go up in moistureproof cloth upper berth again multilayer real wood floor, nail in order to do not have a head on fair tenon truly 45 degrees of horn are nailed fixed and multilayer; of real wood floor

Note: Actually, multilayer installation of real wood floor is by installation the worker is undertaken, be opposite here so multilayer measure of installation of real wood floor does not introduce more, additional, small making up those who need to warn broad customer is: Multilayer installation of real wood floor must choose experience Taoist priest, skilled installation worker. 

[url=http://wpcexport.com/supplier/19078.html]plastic wood durable decking[/url]

[url=http://wpcexport.com/supplier/19065.html]construction decking suppliers cyprus[/url]

[url=http://wpcexport.com/supplier/19030.html]wear resistance privacy fence panels[/url]

[url=http://wpcexport.com/supplier/19000.html]green composite wood prices[/url]


China is a kind very distinctive floor is phyletic, wear-resisting, compression, moistureproof, fire prevention, floor of its real wood of physical function excel, floor of real wood of tensile strength prep above and shrinkage under real wood floor, accordingly after laid not the arch since not craze, screwy, changeless form. Ferial in, our choose and buy wants to notice when wood floor, do not want the wood floor with not clear grain of choose and buy. 


As we have learned, high grade wood floor is 3 years of above unripe wood refines and become. When choosing wood floor board, want to use weight of weigh in hand of hand weigh in hand, choose the wood floor board with heavier weight. The wood floor board with lighter weight is made with the tender wood that is born to two years normally, tender wood did not become a useful person, density small, wood is qualitative tenderer, stability and the compressive strength that defy a turn is not very good. The wood that 3 years above gives birth to criterion density big, stability is good, more strong and durable. 


The new old light of flooring values wood the capacity is insufficient still, observe its grain even, if grain is punch-drunk, the wood that shows this wood floor is not fresh, it is datedder wood. 


Rate of good wear-resisting of wood floor surface is higher. wood floor is to use normally inferior smooth wear-resisting lacquer, when choosing wood floor board, usable sandy soil makes a round trip in wood floor surface burnish ten, if wood floor does not have apparent change, state its wearability is better. Because wood floor is structure of plant crude fibre, hardness tall, density is big, so its heat conducts function, fight be out of shape function compares other and wooden floor better, optimum still the floor board that makes heating of the heat of the earth's interior. 


Precision of wood floor treatment is very important also. 10 wood floors of the left and right sides can be taken arbitrarily when choosing, put on level off ground, the floor spells the floor with the orderly without large crack, appearance, structure is stable wood good for quality floor after closing. Additional, after wood floor passes particular 2 char technology, the nutrient such as cent of the bug egg in wood, will adipose, candy, protein is all after char, not only waterproof properties rises greatly, also put an end to problem of bug eat by moth at the same time. 


The expert reminds say, wood floor is being used daily in, should avoid good thing to bump, edge tool cut, metal grinds etc. When cleanness, application is so pigheaded that application drier mop wipes. If the condition allows, two hit floor 

[url=http://wpcexport.com/supplier/18086.html]swimming pool tile[/url]

[url=http://wpcexport.com/supplier/18073.html]natural marine decking sheets Malaysia[/url]

[url=http://wpcexport.com/supplier/18060.html]second floor outside balconies nigeria[/url]

[url=http://wpcexport.com/supplier/18051.html]florida condominium balcony tiles[/url]


Cork floor is after smashing cork into grain shape, the course reduces the floor board that bake is machined and becomes. The pyramid top that cork floor is called to be floor consumes . Have environmental protection sex, sound insulation sex more quite with real wood floor, moistureproof effect also is met betterer, cork floor flexibility is admirable, bring a person admirable crural sense. Although the old person is mixed,child trip also won't feel too aching in the ground.

Of course the value of cork floor is relative also taller, the price of homebred cork floor on the market is in probably every square metre 220 to 500 between, and of the entrance be in every square metre 700 the left and right sides, installing so process and many attention wants in be being used daily. In installing a process: Before installation even burnish ground planishs upper and clear bulgy part, eradicate the ground to become loose reach attachment; to do an aspiration first, sweep clean grey broken bits first, only area floating dust is inhaled with cleaner after, if take water burnish floor, want airing ground; to give floor the reverse side to blow glue of special floor board equably first, blow the park after glue 3 hours to be able to be used.

After that is using period of time Cork floor How should maintain again? Use 3, specific place is like to have after 5 years wear away, OK and local use make up for, put on coating afresh in local office namely, its method is very simple, use sand paper burnish gently in gall, cleared the dirty content on its face, next dry soft cloth wipes reoccupy clean gently, recoat makes coating, or in local office Fu sticks polyester film. To the cork floor that the surface brushs paint its maintain like be the same as real wood floor, it is good that average half an year hits floor wax. The surface has what the cork floor of colophony wear-resisting layer is the same as compound floor to nurse euqally simple. Prevent to heat up harm. Avoid by all means spends isotherm of hot water cup taller article to be put on the floor directly, lest iron bad surface paint film. Should prevent the sun as far as possible at the same time long point-blank floor, lest paint film by ultraviolet ray after long-term and intense illuminate, premature and weather-shack with ageing. Floor installation just can put furniture to the floor after 24 hours, 24 personnel decreases to be in what its go up to ambulate as far as possible in the hour. Leave home when going out, ask you to close good window, door especially faucet, lest water of rainwater, drop immerses floor.

qatar diy wpc tiles

Seven Trust Wood Plastic Composite

wpc fencing cost estimator

outdoor square Casual tables and benches

A contractor in the US state of California is using skid steer loaders from Volvo CE to help in its line painting operations. The machines are being used to carry out major road marking projects in Southern California. The first machine bought by the firm has been used on the I-5 highway. Driving along the centre double line,sealing an asphalt driveway the skid steer loader is used to remove the reflective pavement markers from the asphalt and pop them into the 1.5m bucket. To boost performance, contractor Payco's industrial team developed a modification to the skid steer loader with a plate welded to the front bucket edge. As a result, the MC115C removes the reflectors efficiently at high speeds.

The machine has proven itself tough enough to cope with the shock of popping markers from the pavement. And satisfied with the skid steer loader’s performance,vibratory roller rental rates Payco recently added a second Volvo MC115C to the fleet to grind off thermoplastic striping from roadways during relining projects.

QLB500--4000 series of asphalt concrete mixing equipment I plant, I plant on the basis of advanced foreign technology, independent development of asphalt mixing plants have independent intellectual property rights. The high degree of automation, measurement precision, modular design, reasonable and compact structure, easy operation and maintenance, energy-saving and environmental protection, can be widely used in the production of higher asphalt pavement based material.Road Repair Equipments - Road Machinery Equipment Manufacturers The machine uses industrial control computer central control system, measurement system used in Switzerland Toledo weighing sensor and electronic metering, said the introduction of US air cleaning bag filter bag, Germany injector burners and other advanced equipment, with a reasonable structure, excellent performance, accurate calculation, energy efficient, easy to operate. It is home to highway construction, production equipment over naive asphalt concrete. Roads are also suitable for counties and municipal road construction companies use. Machine by the aggregate belt conveyor, cold material transmission screen, inclined belt conveyors, barrel heating system, fuel injection combustion system, ESP, chain bucket elevator, shaker hot material, aggregate storage, weighing hoppers, aggregate measurement , warehouse powder, powder measurement, asphalt metering, stirring the pot, track hoist and traction hoist, finished silos, central control room. Mixing process to form a complete system. For mixing machine more compact and easy to operate, especially the shaker, aggregate bin, aggregate measurement, stone powder measurement, asphalt metering, stirring the pot with three-dimensional vertical layout, constitute a reasonable device group ----- mixing plant. Machine by the computer program control, can also be manually controlled boards.Pavement Repair Equipments - Road Machinery Equipment Manufacturers Industrial control computer central control system, measurement system used in Switzerland Toledo weighing sensor and electronic metering, said the introduction of US air cleaning bag filter bag, Germany injector burners and other advanced equipment, with a reasonable structure, excellent performance, and accurate calculation , energy efficient, easy to operate and so on. It is home to highway construction, production equipment over naive asphalt concrete. Roads are also suitable for counties and municipal road construction companies use. Machine by the aggregate belt conveyor, cold material transmission screen, inclined belt conveyors, barrel heating system, fuel injection combustion system, ESP, chain bucket elevator, shaker hot material, aggregate storage, weighing hoppers, aggregate measurement , warehouse powder, powder measurement, asphalt metering, stirring the pot, track hoist and traction hoist, finished silos, central control room. Mixing process to form a complete system. For mixing machine more compact and easy to operate, especially the shaker, aggregate bin, aggregate measurement, stone powder measurement, asphalt metering, stirring the pot with three-dimensional vertical layout, constitute a reasonable device group ----- mixing plant. Machine by the computer program control, can also be manually controlled boards. high quality hydraulic slotting machine save oil machine for crack router concrete road construction details road equipment sale
How potting road construction? Construction technology on pavement pouring glue mainly include slotted, clear joints, pouring. Of course, three simple looks simple, but the details of which aspects need attention. mainly include: Clean seam. First, with clear saw clear sew seams of sand, mud coagulation, greater than 0.5mpa use compressed air, the elimination of seams dust and other contaminants to ensure clean and dry joints and internal wall, the wall joints to rub test no dust is pouring criteria.Road Repair Equipments - Road Machinery Equipment Manufacturers Taping. In taping the cracks on both sides to prevent pollution pouring glue overflow pavement�� Ingredients from full-time staff according to technical requirements and the ratio of ingredients, mix well. Pouring can not be filled once, 2-3 timesPavement Repair Equipments - Road Machinery Equipment Manufacturers Clean up the site. Once pouring glue for the excess condensation overflow To clear the road to keep clean. Construction period by both parties through consultation requirements for staffing and adjust the speed of construction. Construction quality construction standards in strict accordance with the Ministry of Transportation road construction. milling asphalt pavement open joint on bridge sign meaning gravel road in indiana sealant for concrete lowest
Shanghai highway guardrail added a new batch of slot machines and cleaning vehicles, will soon work in and outside the island. New equipment to fill the vacancies in road maintenance, increased pavement, road infrastructure maintenance efforts. Slot machines for pavement crack repair,Road Repair Equipments - Road Machinery Equipment Manufacturers can be cut out of the cracks in the pavement a slot, and then after filling the sealant inside the program to achieve the effect of pavement crack repair, to further ensure the overall road performance, extended service life of the road. Since the new slot machines purchased using double filtering and tertiary air filtering device which filters the air before entering the second stage filter means out more than 90% of the contaminant in the past Notch Pouring scene dusty scene will not ceased to exist. Arrival fence cleaning car is greatly enhanced guardrail cleaning efficiency compared to manual work but also enhance the safety of operations.Pavement Repair Equipments - Road Machinery Equipment Manufacturers Newly purchased fence cleaning vehicles with four rotating brushes 0-45 degree angle technology, to achieve horizontal and vertical fence brushing. Nylon filament with rubber mixing technology, efficient cleaning of the fence is also easy to damage the paintwork. The car is also equipped with high-pressure water jets for flushing the crossbar, making cleaning more effective, more efficient rate. used used pothole patcher for sale tarmac crack filler inexpensive vertical slotting machine taiwan electric jack hammer spares fix address
Well-known highway beautification inseparable asphalt distributor, the device is in the beautification of our living environment, play a big role,Road Repair Equipments - Road Machinery Equipment Manufacturers showing the quality of performance, that is what we see. But we choose asphalt distributor still need to pay attention to what the problem, explore together.We found in the technical specifications for highway construction, fixed asphalt distributor are there provisions. Different is going to affect the flow of its speed asphalt pump, asphalt for professional engine driven pump asphalt distributor, its speed and the speed can all be adjusted by the engine. Thus, the two work closely together to make reasonable adjustments in order to achieve good spraying results. Therefore, we selected asphalt cloth car, do not just look at its external quality, but also according to various properties of asphalt distributor, such as asphalt pump flow, and the vehicle speed is consistent.Pavement Repair Equipments - Road Machinery Equipment Manufacturers Bituminous material. Treatment bituminous asphalt surface permeability material requirements, setting time is short, good adhesion, ease of construction and poured, good durability, materials commonly used in asphalt road asphalt, emulsified asphalt or coal tar. Treatment road asphalt is an ideal material for the construction of the asphalt surface, due to the poor permeability asphalt road, to improve adhesion, should be poured on the base layer of transparent, when using liquid petroleum pitch selection rapidly solidified liquid asphalt to shorten forming period. The construction of different asphalt content should be determined according to the temperature construction, asphalt grade, base, asphalt dosage should be increased by 15% -20% higher than the amount of oil when using coal tar pitch. When using emulsified asphalt, bitumen emulsion amount should be converted content road asphalt, emulsified asphalt and coal tar pitch type and grade required to choose. best intelligent asphalt distributor contraction joint vs expansion joint portable portable heat lance sealing machine in nigeria
The floor slabs produced by uneven settlement of the foundation are accompanied by a portion of the concrete along the height of the building Soil components and internal and external wall cracking and other characteristics. Such as: a teaching building for the brick structure, the basis of the use of sinking pipe pile, because the pile did not hit the holding layer, the building serious uneven settlement, resulting in walls, beams, part of the beam-column joints and cast-in-place concrete slab Cracked.Road Repair Equipment - Doan Machinery Concrete strength, a serious shortage of concrete slab A four-storey brick and concrete structure office building, completed and delivered in 1988, recently found three or four floor part of the board surface along the supporting wall around the wall cracks, the bottom of the plate to the four sides of the extension of the oblique cracks (see Figure 1 ). The fracture form is consistent with the stress characteristics of the floor, and the strength of the concrete of the three floors and two floors is detected by the bulletin method. OMPa, four layers of two open floor of the concrete strength of the estimated values ??were *. SMPa and *. 7MPa, are less than the standard value of the design strength C18; Drilling measurement The above four open floor of the concrete slab thickness measured between 58-62nun, are less than the design value (80mm). Therefore, it can be determined that the floor cracks are concrete strength, the concrete thickness is seriously insufficient, the use of disasters and accidents, a large commercial center has two basement, during the construction process, due to groundwater buoyancy caused by the basement and superstructure of the floor, Column cracks and floating phenomenon, part of the floor serious cracking. A building center in the construction due to a strong typhoon positive attack, the main building on the west side of a 400 tons of rice tower crane was strong wind down, the main building on the west side of the reinforced concrete frame structure suffered heavy damage, reinforced concrete floor and frame beam column serious cracking, concrete Component damage is serious. seal the Asphalt pavement crack liquid tarmac repair machine price rural road maintenance work summary types of joints in concrete

As we all know, asphalt pavement in the long-term repeated load and the role of natural light, inevitably there will be pit, bag package, net crack, subsidence as the representative of the various diseases. Because sometimes design, selection and construction quality of the wishful, more quickly the frequency of the occurrence of the disease. If these diseases are not repaired in time to restore the basic functions of the road, not only will affect the traffic flow, but also to accelerate the expansion of the disease, greatly improving the cost of repair works. Therefore, the timely repair of asphalt pavement has become one of the increasingly important priorities of highway maintenance units.Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery

Cold and modified asphalt solution repair pit, without heating, to achieve a cold oil, cold materials, cold mix. The car in the operation can be based on the base layer, grass-roots, surface layer of the different requirements of free gradation, mix out to meet the requirements of the base layer, grass and surface materials. The car can use the vehicle to carry the equipment to make the asphalt pavement repair process to complete a one-time. Since the success of research and development, has been in Shanxi and a number of high-grade highway to promote the application, received a good effect. As the main designer of the device, the author will be its main performance, structure and functional characteristics described below. !!"!car.!"# Hydraulic ramming hammer, hydraulic grasping 91 hydraulic pump station for hydraulic ho, bucket to provide hydraulic power. Hydraulic hammer for the use of road cutting machine, from the crushing effect; hydraulic ramming hammer for tamping the material, especially the pit dawning of the solid; hydraulic grab for stone, water stability and the machine to carry the lifting equipment.

Mixing shaft and synchronous gears

There is no doubt that high-grade roads, especially the highway repair, only the use of the application of multi-functional conservation machinery to complete, which is to ensure the construction quality and improve the efficiency of the only choice, but also to achieve highway management modernization and civilized construction of important guarantee and premise The Multi-functional integrated maintenance vehicles to repair the classification can be divided into hot and cold operations two. With the continuous development of science and technology, cold repair mode of operation with its many advantages increasingly praised by the highway engineering academia. And Shanxi Provincial Highway Bureau Jinzhong Branch and Shanxi Hualong Traffic Technology Co., Ltd. recently developed successfully It is mainly used for forced mixing of asphalt mixes and water stabilizers. For the base layer, the base of the hopper by the (hopper composition, and the surface of the different requirements of the ratio of stone, gravel, cement storage.

overview of rubber asphalt production equipment sealing cracks in concrete driveway predictive maintenance machine

The practical results show that the microwave heating has the characteristics of fast heating speed, uniform heating and large heating depth. By means of microwave heating, the microwave is used to improve the heating and maintenance of the vehicle. The cost of repairing pits is lower than that of traditional heat radiation heating integrated maintenance vehicles, and the measures taken by microwave heating integrated maintenance vehicles to prevent microwave leakage are introduced.

With the increasing mileage of expressway traffic in Fujian Province, the increasing age of the province, the current 11 only traditional radiation heating asphalt pavement repair car has been unable to meet the province's highway asphalt pavement maintenance needs. In order to ensure the smooth development of maintenance tasks, to ensure the safe and smooth flow of the highway, the purchase of new, suitable for the maintenance of the province's asphalt pavement integrated maintenance equipment has become a top priority. From August to November 2010, Fujian Expressway Maintenance Engineering Co., Ltd. introduced a microwave heating asphalt integrated maintenance vehicle in Longyan area conservation company trial, and the relevant performance indicators, the cost of the actual calculation.Road Repair Equipment - Doan Machinery

The Principle and Advantages and Disadvantages of Existing Asphalt Pavement Repair

Fujian Province Highway Maintenance Engineering Co., Ltd. to undertake Fujian Province, 2700 km highway maintenance tasks. Pavement pit repair task is mainly composed of 11 early asphalt pavement integrated maintenance vehicles to complete. The car on the asphalt pavement heating method for the heat radiation heating. The principle of heating: liquid liquefied gas after vaporization in the bottom of the heating wall to fully burn, heat through the refractory bricks blowing to the ground, intermittent heating, layers of penetration. This type of heating is actually a visible light in the pavement, because its conduction and convection accounted for a large proportion of radiation heat is small, easy to make the road was scorched or oxidized. It is not conducive to the recycling of asphalt mixture. The advantages of the thermal radiation heating method are: heating wall heat storage capacity, radiation temperature is high, thus ensuring sufficient radiation energy. Refractory brick work, the temperature reached more than 1000 ℃, the surface of a red, easy ignition, and the temperature in the work area more uniform. The main drawback is that, despite the use of intermittent heating, it is not easy to control the surface temperature of the heated pavement. Because a large number of visible radiation is very concentrated, energy radiation fluctuations, the peak temperature of the road again and again, not easy to balance. Refractory bricks have lower strength, higher cost, continuous high temperature use and easy to damage after vibration, increase the use of cost. Refractory brick replacement professionals and professional tools, maintenance is very convenient.

oil spill on asphalt road high-quality rf bags welding machine what is a grinding machine

Construction material control, in the choice of modified asphalt, should be used Shell matrix AHc-75 modified asphalt. When selecting coarse aggregates, gravel should be crushed by basalt counterattack, and the amount of mud should be kept within 1%. In the actual construction process, the standard gradation in the mix should be tested to make appropriate adjustments.Road Repair Machines

Asphalt mixture with the ratio of control, should be used Marshall test design, immersion Marshall test residual stability test and rutting test three parts of the asphalt concrete mix ratio control, should be strictly in accordance with the target mix design stage, production mix design stage and production The ratio is designed to match the ratio.

Milling construction control.To deal with the extent and depth of the treatment of the surface layer to determine the use of measuring instruments in the milling side of the left and right sides of the milling plane width and depth of the measurement to ensure its width and depth to meet the design requirements; Milling the surface of the situation and the wear of the blade to detect, if the milling groove groove is not neat or uneven phenomenon exists, should promptly notify the operator to the milling machine, and timely replacement of the blade to ensure that the milling The quality of the planer is improved. Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery,Milling, should ensure that the longitudinal edge of the line, in the milling process, the marking line should be used as the milling machine control line, between the carriageway and the ultra-lane should be set between the dotted line, the use of artificial methods Set the unmarked portion. In the process of milling, the milling machine should excavate the roadway with the disease. At the time of excavation, the edge should be ladder-shaped, and the seams between the two layers should be staggered by 15cm. If the following layer of loose or weak phenomenon occurs, should be the top of the grassroots excavation, in accordance with the excavation of the three-tier approach to the road for processing. In the milling, should also be used to control the amount of water, as far as possible the use of the least water, slag tide and not wet and milling after the existence of no trace of the ground as a standard to ensure that the end of dry cleaning and dust removal.

Dust: the use of high-power air compressor with duct equipment for dust, dust on the road can be quickly blown to ensure its cleanliness. In the milling of the roadway, due to the milling machine re-paragraph will have more water spray phenomenon, and the track on the part of the slag for compaction, the use of steel wire on the milling surface of the loose residue to brush, Repair the pit area of ​​the pit, should be used to manually remove the residual debris within the pit.

making a concrete slope road maintenance sweeper for sale cheap router crack equipment suppliers

Asphalt pavement milling paving technical methods to ensure the quality of highway engineering is essential. In order to solve the problem of unqualified paving technology of asphalt pavement, the construction unit should carry out inspection and calibration of the asphalt weighing gage on a regular basis according to the test and accumulate, and obtain the metering and certification to ensure the asphalt The quality and uniformity of the mixture. Calculate the amount of daily asphalt and coke ore material, adjust the production mix ratio, so that the test stone than to meet the requirements to ensure that the vacuum device is working properly and the amount of ore asphalt is accurate to ensure that the ratio of asphalt within the specified range. In order to ensure the uniform thickness of the asphalt layer, the construction unit in the asphalt pavement paving paving shop should be carefully determined loose pile coefficient, according to the daily construction of asphalt mixture paving the actual detection of the total paving thickness corresponding The adjustment. Before the construction of strict Marshall test to ensure the accuracy of Marshall standard density, carefully check the lower seal elevation, reasonable organization of rollers and paver, to ensure that the pressure roller overlap and compaction times, choose to meet the requirements of the quality of the pressure road to compaction , Adjust the work of the paver and its leveling device, so that the number of compaction and road thickness in line with the provisions. At the same time do a good job insulation work to ensure that the asphalt mixture rolling temperature meet the requirements, and then improve the asphalt pavement paving construction technology.Road Repair Equipment - Doan Machinery

Based on the study of the problems of asphalt pavement paving construction technology in highway construction and its influence on the construction quality of asphalt pavement, the author thinks that the construction unit should firmly believe that "science and technology are the primary productive forces", and the whole asphalt pavement Milling paving construction process, we must strictly develop the asphalt pavement milling plan construction plan and strict paver operating specifications, according to the asphalt pavement paving paving pre-construction test to determine the asphalt material configuration, to strengthen the construction staff Supervision and management, to establish a sense of responsibility and mission. In the asphalt pavement paving construction work is completed, we must do a good job of road health work to ensure that the quality of asphalt pavement construction projects for the benefit of the public.

how much do steam roller weigh best time to seal asphalt driveway best way to seal cracks in driveway

The adhesive layer is laid before the asphalt concrete pavement. 1.5 hours before the start of the sprinkling of the asphalt layer, the surface of the lower and lower layers is slightly wetted with water and the traffic is restricted. Sprinkle the sticky oil evenly with the sprinkler equipment approved by the supervising engineer, and the spreading temperature and sprinkler rate shall comply with the technical specifications. Note that precautions should be taken to prevent contamination of other appendages (such as guardrails, etc.) during spraying. For excessive sprinkling of the place must be modified asphalt from the sprinkled surface scraping, leakage or less sprinkle the place must be made up. The viscose-modified asphalt should be finished within 24 hours prior to paving the cover. The surface temperature of the cloth must be higher than 10 ℃, moderate wind speed.Road Repair Equipment - Doan Machinery

Asphalt concrete surface construction

After the milling, the modified 4% AC-13C type modified asphalt concrete and the middle layer are sprinkled with modified emulsified asphalt adhesive layer. The old and new asphalt concrete transverse joints are imported with double-sided adhesive bonding. The surface layer cracks at the location of the use of anti-cracking paste for processing. Using the factory concentration of mixed asphalt mixture, dump truck insulation transport, paver paving, roller rolling molding of the construction process. Asphalt concrete used in the pile of storage, and in the construction of a sufficient number of qualified materials before storage, stacking materials with 15cm thick cement concrete hardening, in the material and material boundary with brick walls, to prevent mixed materials. The room is equipped with intermittent asphalt mixing station 1, the output is 100t / h. Mixing station equipped with temperature detection system flow, and with finished storage silo and secondary dust removal equipment. In addition, there are two sets of powder with automatic lecturer device to join the system. At the same time there are two (100t /) asphalt storage tank, and heated with heat transfer oil.

type of tractors used in construction function of a milling machine hammer drill high efficient

Asphalt mixtures require the use of larger tonnage dump trucks. From the storage silo to the unloading car on the loading, 3 times loading, the first by the front of the car, the second by the rear of the car, the third loading the middle of the compartment to prevent the thickness of aggregate separation.

At the beginning of paving, at least five cars in front of waiting for discharge, to ensure the continuity of paving and road surface roughness. At the same time require the transport vehicle compartment floor coated with thin layer to prevent asphalt bonding of the isolation layer or anti-blocking agent. Paving the process of transport truck paver 100 ~ 300mm before the stop, waiting for the gap, pushed forward by the paver began to slowly discharge, to avoid impact paver.

Due to mixing field from the paving site distance is different, transport cargo vehicles must be covered with sheet insulation, rain, pollution.Road Repair Machines

The paving machine starts with three pieces of wood, such as the thickness of the concrete, as well as the thickness of the asphalt concrete compaction thickness, and the ignition screed so that the temperature can reach more than 100 ∀. Paver must be 1 ~ 3m / min speed, uniform, continuous uninterrupted paving, midway can not be variable or downtime to wait for the phenomenon, to prevent the impact of road surface roughness.

Asphalt mixture paving the spread of the temperature shall not be lower than the specified temperature, the paving the loose pile coefficient can be determined according to the test stand. Before paving, do asphalt sticky layer of inspection and cleaning: the surface of the surface after the milling of floating mineral materials, surface debris clean.

Milling Roadway dust removal equipment should use high-power air compressor dust blowing dust, so that the road cleaning dust quickly blown to the progress of the follow-up process to ensure clean and clean. The use of high-pressure air to the final blow to the milling slot to bring quality protection. And should try to avoid the spill of diesel, damage to the road, transport trucks and tools can not be used to clean the strict control of the asphalt mixture of various parts of the temperature, is conducive to ensuring the quality of asphalt concrete pavement construction. The factory temperature is higher than the specified temperature, paving less than the specified temperature of the asphalt mixture to be abolished. Asphalt concrete paving, should follow the rolling, control a good rolling times, and can not overpressure. Pavement asphalt concrete surface should be more static compaction, less vibration compaction, especially the milling side of the groove, because the vibration of the exciting force will be the edge of the original slab groove, resulting in paving because there is no solid wall Role and soon damaged. Vibration compaction is only 1 to 2 times after static pressure. Should be carefully dealt with vertical and horizontal joints and construction joints, to ensure that the new pavement and the original layer of dense joints, flat. It is forbidden to have a roller on a completed or rolling section

heavy equipment auction results power trowel finish concrete user friendly potting machine
Pages: 1 2 3 4 5 »

Trending